02:50 - The AES-SI group personnel cycled the 31-ID SS2 shutter at the beamline. All FEEPS and PSS faults at 31-ID have been cleared. We disabled the shutter permit key for S1-35 and preparing to inject. 03:05 - Fill #2 was delivered.