[Xrayops] update on Fill #1 loss at 23:49 on 6/2/10
APS Experiment Hall X-ray Operations Problem List
xrayops at mailman.aps.anl.gov
Thu Jun 3 02:18:31 CDT 2010
02:05 - The AES-SI group personnel are onsite to investigate the SS2
shutter at 31-ID which failed to fully close. This prevents SR
injection. Estimated repair time for the shutter at this time is
approximately 0.5 hours
S24A:S2 power supply converter issue which caused initial beam loss,
has been repaired at 01:18.