[Xrayops] Suspension of Top-Up

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Tue Nov 22 01:00:27 CST 2011


Top-up was briefly suspended at ~00:51 due to an injector issue in the 
LINAC. The injector was reset and top-up was resumed at 00:52.

MCR Operations
ASD-AOP


More information about the XRAYOPS mailing list