[Xrayops] Top-up aborted

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Tue Nov 22 05:36:19 CST 2011


Top-up was aborted at 05:10 on 22 November 2011, due to an injector 
problem in the Linac. Technicians are being called in to make repairs on 
a RF system. There is no estimated time of repair at this time.

MCR Operations
ASD-AOP


More information about the XRAYOPS mailing list