[Xrayops] Top-Up operations have been resumed.

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Tue Nov 22 06:42:48 CST 2011


RF group technicians were called in to repair a power supply in one of 
the LINAC RF systems. The repair is now complete and Top-up was resumed 
at 06:30.

MCR Operations	
ASD-AOP	


More information about the XRAYOPS mailing list