[Xrayops] S:IS1 Downtime
APS Experiment Hall X-ray Operations Problem List
xrayops at aps.anl.gov
Tue Oct 8 12:51:45 CDT 2019
Problem: As of Monday evening, the APS has been troubleshooting an issue with injection septum S:IS1 operation.
Activity: The ASD Power Supply Group with assistance from the AES/MOM Group have been actively diagnosing the source of the problem. As of this morning, additional diagnostic tests have resulted in the decision to replace the injection septum magnet assembly. A spare septum magnet assembly has already been located, and is in the process of being electrically tested and vacuum checked and is in the process of confirmatory testing. Work planning and control efforts are progressing in coordination with HP, Rigging & Lifting, WSH and a host of AES support groups. The removal/installation time as well as bake-out and demobilization, followed by SR conditioning and start-up, has put the estimated downtime at approximately one week.
Estimated time of shutter enable: N/A
Next planned update: Recurring updates will be provided once daily, at a minimum as information becomes available.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20191008/85bc0565/attachment.html>
More information about the XRAYOPS
mailing list